新闻banner
Current location : HOME >> News >> Technical Information

Notes for operation of riveting machine

2022-01-06

Do not work for a long time under high pressure, the extension length of the riveting head of taicang riveting machine should not exceed the specified value. Stop for maintenance immediately if any abnormality occurs, and then troubleshoot the fault. The guide rails of the equipment should be buttered once a month to lubricate and prevent rust. The assembly and disassembly of the riveting head should be light. The riveting machine should not use brute force to pull out the riveting head, especially when disassembling the riveting head. It should rotate the riveting head and pull out the riveting head slowly. If the rivet seat is pulled out of the normal position, the position of the rivet head will appear obvious deviation after the installation of the rivet head. At this time, the red safety cover should be removed and the rivet seat can be used only after it is installed in place, otherwise the machine is easily damaged. In the use of riveting head in the processing of some materials will appear slight bonding phenomenon, in order to ensure the quality of riveting, should be regularly on the riveting head cleaning, to prevent metal bonding thicker. The riveting head is fixed to the chuck of the lathe for cleaning, and then polished with sandpaper.


Daily maintenance shall be carried out on the equipment every two weeks. The main maintenance items are as follows. If problems are found in the riveting machine, they shall be dealt with in time. Check whether the lubricating oil in the pneumatic triplet oil cup is sufficient, or fill the oil cup. Check each steam pipe and joint are firmly connected, whether there is leakage phenomenon. Check whether there is bonding phenomenon in the cavity of the riveting head, if so, it should be cleaned up. Lubricating grease should be added to the spherical pair, and the equipment should be stopped for maintenance in batches every 6 months. The following items should be mainly checked. If any problems are found, they should be repaired in time. Check whether there is air leakage in the upper and lower parts of the cylinder, or replace the sealing ring.


Check the pressure riveting machine each steam pipe and joint is firmly connected, whether there is leakage phenomenon. Check whether the protruding length of the riveting head exceeds the standard, otherwise it should be replaced. Check whether the swing of the riveting head is normal, otherwise the machine will be stopped for maintenance. If the spherical pair is faulty, the spherical pair should be replaced or repaired in time. Check whether the noise and riveting quality are abnormal during spindle rotation, if so, it should be checked. If the problem is bearing wear or damage, the bearing should be replaced immediately. Grease the spherical pair. Guide rail and other parts should be smeared with butter to lubricate and rust.


标签

本文网址:/en/news/413.html

Recently Viewed: